Lightning Monitoring System Solutions

Resource: 本站Author: admin Date: 2017/4/13 Scan: 0

Computer technology in today's society, the increasing development of communication technology, all kinds of electronic equipment, a large number of applications, sensor to a nearby lightning strike the earth conductor to form over-voltage can be as high as several thousand volts, for microelectronic devices is lethal. The main invasive access LEMP a power line, all kinds of signal transmission lines, antenna and feeding line and into the system of pipes, cables, conductors and other invasive equipment systems bridge, resulting in electronic equipment failure or permanent damage. Therefore, the lightning impulse protection channel will be thunder and lightning in the invasion of stemming the flow into the land, and thereby to protect the electronic equipment of the head with. The main option is to use segregation, and other bits, clamp, are pressure, filtering, shielding, over-voltage over-current protection, grounding and other methods will be lightning over-voltage, over-current and lightning electromagnetic pulse device to eliminate outside, so as to effectively protect the devices. At present mainly uses gas discharge tubes, discharge gap, high-frequency diodes, varistors, transient diodes, thyristors, high and low pass filters and other components, depending on frequency, power, transmission rate, impedance, VSWR, insertion loss, bandwidth , voltage, current, etc., combined into the power cord, Antenna, signal line Series Surge Protective Device (SPD) is installed in microelectronic devices for external circuits, the ground access system according to the principle of sharing the earth ground before will not cause a ground counterattack. As long as rational design, installation qualified, surge protector lightning can be an effective defense. 

1, monitoring system design based on an integrated mine 

Integrated lightning protection monitoring system designed mainly uses the following criteria for the design reference. 

(1) IEC61024 "Building Lightning Protection" 

(2) IEC61312 "Lightning electromagnetic pulse protection," 

(3) B50057-94 "Lightning Protection Code for Design of Buildings" 

(4) GB50200-94 "cable television systems engineering technical specifications" 

(5) GB50198-94 "Civil closed-circuit TV surveillance systems engineering technical specifications" 

(6) GB/T50311-2000 "building and architectural complex integrated wiring system design specification" 

(7) XQ3-2000 "Meteorological Information System lightning electromagnetic pulse protection norms" 

2, monitoring system, the principles of integrated lightning protection 

A comprehensive monitoring system should be designed to take into account environmental factors, lightning, lightning activity patterns, the system equipment, the importance of the severity of the consequences occurring Leizai, respectively, take appropriate protective measures. 

(1) in conducting a comprehensive lightning protection design, should adhere to a comprehensive planning, comprehensive management, optimization design, multiple protection, advanced technology, economic and reasonable, periodic inspection, random upheld the principle of integrated design and maintenance. 

(2) integrated mine monitoring system should be designed with lightning directly stroke of lightning protection equipotential bonding, shielding, reasonable layout, use of ground system and installation of surge protection devices such as comprehensive protection measures. Must adhere to the prevention, safety first guidelines. 

(3) The monitoring system should be based on an integrated mine-area thunderstorms grade equipment placed in the lightning protection zone of the different positions, different standard of protection. 

3, monitoring, signal systems, building lightning directly stroke protection and earthing measures 

(1) In each surveillance camera outside the top to install a stainless steel lightning rod to protect the equipment from lightning directly stroke hazard cameras. 

(2) The lightning rod of the Yin Xiaxian make best use of steel columns Discharge line, conditions were not right, they can be used alone for more than 25mm2 copper pair to wear galvanized steel shield, and do insulation treatment, directly from the lightning rod tip the shortest path into the earth, in order to reduce the time of discharge lightning electromagnetic pulse radiation damage to microelectronic equipment system. 

(3) Each outdoor camera and all the signals around the gun rod rack around, plus ancillary ground network to do a simple specifications as follows: 

To net deepened 80CM, W 30CM, length 10 ~ 15M drains a 

Polar, material specifications angle iron 4, 2.5M length, at intervals of 2.5 ~ 3.0M to fight one. 

Connect to an extremely flat iron. . . . . . 

(4) Each network easily be the basis of the nearest reinforcement connected with the house, to be effective lightning protection, connection material 25 mm2 multi-strand copper wire or Φ12 reinforced. 

(5) Each power supply cabinet ground wire and the shell with 25 mm2 multi-strand copper wire with the ground network connection conduction. 

(6) signal and the signal wire rack shell shield by 10 mm2 multi-strand copper wire grounding. 

(7) 10 outdoor camera gun, signal cabinets, networks need to be a simple way for offices and other potential links (and villa-based ground network). 

(8) 

4, lightning electromagnetic pulse (LEMP) protective measures 

Lightning electromagnetic pulse (LEMP) induced electromotive force generated by intrusion-channel signal superimposed on the line to generate transient high voltage, destroying various types of electrical equipment and micro-chips, and therefore mine projects need to focus lightning sensors to carry out an effective defense. In the design of an integrated mine when the channels should be more focus on protection, while making connections and sharing of equipotential grounding system. 

4.1 Monitoring Center Monitoring System lightning protection measures 

The total distribution switch control room to install a lightning Flow capacity Imax ≥ 40kA (waveform 8/20μs); nominal turn-on voltage Un ≥ 2.5Uc (Uc: Maximum working voltage); Ta ≤ 50ns response time, a single -phase surge protector SPD1, model: HD-D380C-XS40, in parallel, as a central monitoring equipment, the total power protection. 

In the power equipment installed before or after a lightning-pass flow capacity of Imax ≥ 10kA (waveform 8/20μs); nominal turn-on voltage Un ≥ 2Uc (Uc: Maximum working voltage); Ta ≤ 50ns response time of single-phase surge protector SPD2, model: HD-D220CZ, lightning protection socket, as a second-level protection. 

Outdoor camera gun camera shots dedicated power lines to install surge protectors, Imax ≥ 5kA (waveform 8/20μs); nominal turn-on voltage Un ≥ 2.2Uc (Uc: Maximum working voltage); Ta ≤ 50ns response time of a single model To HD-GVD/220V. 

SPD connection wire should be short and straight, SPD connecting wires should not be greater than 0.5m, when the length of the bold diameter greater than 0.5m should be adequate. 

4.2 Video signal transmission line of protective measures 

Monitoring center video signal processing equipment and outdoor surveillance camera video transmission cables should be installed at both ends of the video signal SPD, model: HD-XH-GVD / A of 1 to protect the center equipment and camera. 

5, shielding measures 

(1) is to reduce the electromagnetic interference shielding the basic measures, should adopt the following measures: external shielding measures, the line laid in the right path, circuit shielding, appropriate combination of these measures. 

To improve the electromagnetic environment, all the buildings together with the large-size metal parts should be equipotential bonding together and connected with the grounding device. The roof of metal surfaces, metal surface elevation, concrete and metal doors and windows within the framework of steel bars have to be connected to equipotential ground. 

The need to protect the space, when using shielded cable, at least at both ends of the shield, and should do so in the lightning protection zone at the junction of equipotential connection. When the microelectronic devices the system requirements to do so only at one end of the potential connection, you can wear a metal pipe into shielded cable, metal pipe at one end so Equipotential. 

Building the connection between the cable should be laid in metal pipes, these metal pipes from one end to the other side of the electrical linking should be across the board, and connected to various buildings and other potential connections bring. Cable shield should be connected to the belt. 

(2) The practice of building or room in the large space shield is supported by metal objects, metal frame or reinforced concrete, reinforced the composition of these natural elements. These elements constitute a large space shield-shaped grille. Penetration of such shielding conductive metal objects should be nearest connected to ground potential to do so. 

(3) The monitoring system equipment room location should be selected in the LPZ of the most advanced areas and to avoid the top three floors located within the building; days when the building part of the lightning surface grid size does not meet the requirements of anti-jamming system should be in Heaven Surface installation shield. Use of non-shielded cable, households before wearing metal pipe and buried in land in the horizontal distance of 10m or more. Who is subjected to conditions not to wear metal pipe buried in households, households should be extended the length of shielding tube or trestle, metal tube or both ends of the trestle bridge and in the lightning protection zone at the junction of equipotential bonding and grounding to be done. 

(4) monitoring system equipment for the metal shell, the application of the shortest wire to connect it with other potential band connection. The case of non-metallic shell, shielding the building when the equipment is located does not meet the equipment, electromagnetic compatibility requirements, should be retrofitted with metal mesh or other shield the equipment shielding, metal net should be equipotential bonding equipotential bonding bands. 

(5), computers, communication, monitoring the equipment room should be about 1m from the external walls of buildings to protect. When lightning directly stroke in order to prevent the building being leaked into the ground along the wall generate strong electromagnetic fields around the Yin Xiaxian damage microelectronic devices. 

6, equipotential ground connection and sharing 

(1) equipotential connection is important in modern mine technology, the protective measures. Will enter a monitoring center building various types of pipeline shield, rack, etc., etc. before entering the building connected to ground potential. Again before entering the device connected to equipotential ground second. The camera output of the outer layer of the coaxial cable and other lines entering the outer front of the building connected to equipotential ground. 

(2) separate from the outer conductive devices equipotential bonding conductors connected to ground in order to reduce system equipment located in the building of metal structures and equipment or between equipment and devices due to lightning potential difference generated. The use of reinforced concrete structure of the building to connect all metal components to build a three-dimensional multi-connected network is to achieve the best choice for equipotential connection. To facilitate the construction of equipotential bonding should be embedded in some suitable place reserved for items such as potential connections. 

Into the system of building various types of plumbing, heating and air conditioning ducts and other metal pipes metal outer office into the building should be done equipotential bonding, gas pipelines, after households should be inserted at a flange connecting two insulated side with the switching SPD connected indoor metal pipe may participate equipotential connection, and combined with the building of large-size metal pieces connected together, according to the requirements of GB50054 to do Equipotential connection, the access to the General, etc. potential to connect with, and reliable ground connectivity. 

(3) In the building entrance, that is, LPZ0B with LPZ1 area at the junction of Main Equipotential connected to ground, in the follow-up of the lightning protection zone at the junction of the total equipotential bonding according to the methods of local equipotential connection, connecting to the main break should include the system equipment itself (including the exposed conductive parts may be), PE lines, cabinets, racks, electrical and electronic equipment enclosure, DC workplace, anti-static grounding, the outer metal shield cable, pipe, shielding slots, Surge Protector SPD grounding, etc. shall be the shortest distance from the nearest equipotential connection with this band direct connection. Basic approach should be used to connect network-based (M) structure, or star-shaped (S) structure. Net-type structure to connect the circular equipotential zone at intervals of 5m through the building wall should be reinforced, metal facade to connect with the grounding system. When using S-bonding network, the system of all metal components except in ground reference point, that is, ERP Department connections, should be common ground with the various components of the system has enough insulation (more than 10KV, 1.2 / 50μs).

0
Home
Tel
Message
Contact
www亚洲国产_精品一区二区三区四区电影_国产高清av_国产露出视频在线观看

    精品久久久久久中文字幕2017| 婷婷五月综合缴情在线视频| 日韩a一级欧美一级| 国产男女在线观看| 91视频 - 88av| 91欧美一区二区三区| 黑人粗进入欧美aaaaa| 国产精品333| 97视频久久久| 真实国产乱子伦对白视频| 欧美午夜精品理论片| 亚洲 欧美 另类人妖| 国产视频在线视频| 蜜臀av午夜一区二区三区 | 欧美 国产 日本| 欧美日韩精品在线一区二区| 91午夜在线观看| 精品人妻大屁股白浆无码| 美国av在线播放| 国产永久免费网站| 999久久久精品视频| 亚洲一区二区三区四区五区| 2025韩国理伦片在线观看| 狠狠操精品视频| 免费看a级黄色片| 亚洲色图38p| 国产三级国产精品国产专区50| 青青草精品视频在线观看| 一区二区在线播放视频| 牛夜精品久久久久久久| 国产三级国产精品国产专区50| 中文字幕 日韩 欧美| 奇米视频888| 久久av秘一区二区三区| 日本三级中文字幕在线观看| 欧美a级免费视频| 青青草视频在线免费播放| 播放灌醉水嫩大学生国内精品| 99999精品视频| 天天爱天天操天天干| 亚洲男人天堂av在线| 一级特黄妇女高潮| 一卡二卡三卡视频| 成年人视频观看| 人人干人人干人人| 欧美日韩在线免费观看视频| www.九色.com| 91av在线免费播放| 天天干天天干天天干天天干天天干| 亚洲色图久久久| 日韩精品aaa| 国产精品videossex国产高清 | 色欲av无码一区二区人妻| 深夜黄色小视频| 成年人免费观看的视频| 欧妇女乱妇女乱视频| 欧美爱爱视频免费看| 我看黄色一级片| 九九久久九九久久| 欧美极品欧美精品欧美| 手机看片一级片| 久久男人资源站| 免费看黄色一级大片| 在线视频一二三区| 日本毛片在线免费观看| 国产三级精品三级在线| 99久久久精品视频| 91热这里只有精品| 伊人久久在线观看| aaa毛片在线观看| 91精品国产吴梦梦| www黄色在线| 日韩免费在线观看av| 一区二区三区韩国| 妺妺窝人体色www看人体| 九九热免费精品视频| 玖玖精品在线视频| 爆乳熟妇一区二区三区霸乳| 国产a级片免费看| av五月天在线| 国产美女在线一区| 久久黄色片网站| 欧美成人精品免费| 污污视频网站在线| 国模无码视频一区二区三区| 91视频福利网| 少妇高清精品毛片在线视频| 91蝌蚪视频在线| 国产欧美高清在线| 一级黄色大片儿| 国产精品免费入口| av中文字幕av| 中文字幕av不卡在线| 一区二区传媒有限公司| 三年中文高清在线观看第6集 | www.午夜av| 久久综合久久色| 欧美 日韩 国产在线观看| 黄大色黄女片18第一次| 青青草成人免费在线视频| 一区二区三区四区久久| 成人av一级片| 人妻激情另类乱人伦人妻| 在线观看av免费观看| 污污视频网站免费观看| 97视频久久久| 9色视频在线观看| 91欧美一区二区三区| 中文久久久久久| 成年人网站大全| 成人黄色av片| 无码 制服 丝袜 国产 另类| 亚洲天堂一区二区在线观看| 欧美成人三级在线播放| 亚洲欧美另类动漫| 国产男女无遮挡| 亚洲熟妇无码一区二区三区| 大陆极品少妇内射aaaaaa| 91社在线播放| 视频区 图片区 小说区| 中文字幕av不卡在线| 丝袜制服一区二区三区| 北条麻妃在线一区| 国产亚洲天堂网| 男人日女人bb视频| 国产资源在线视频| 青青青在线视频播放| 国产美女主播在线| 丁香婷婷综合激情| 国产欧美日韩小视频| 成人免费性视频| 精品视频免费在线播放| 免费在线观看亚洲视频| 成人免费在线小视频| www.亚洲天堂网| 精品www久久久久奶水| 日韩人妻精品无码一区二区三区| 国产极品尤物在线| 成年人午夜免费视频| 欧美日韩精品在线一区二区| 国产99久久九九精品无码| 国产中文字幕免费观看| 国语对白做受xxxxx在线中国| 99免费视频观看| mm1313亚洲国产精品无码试看| 日韩有码免费视频| 一区二区三区入口| www.久久av.com| 中文字幕在线视频一区二区| 日韩video| 欧美视频免费看欧美视频| 国产欧美在线一区| 国内自拍视频网| 亚洲最大天堂网| 黄色特一级视频| 成年人网站免费视频| 久草在在线视频| 午夜天堂在线视频| 欧妇女乱妇女乱视频| 国语对白做受xxxxx在线中国| 奇米影音第四色| ijzzijzzij亚洲大全| 国产精品成人久久电影| 97公开免费视频| 天天操夜夜操很很操| 欧美黄网在线观看| 久久久久久久激情| 国产无色aaa| 免费人成自慰网站| 粉嫩虎白女毛片人体| 色网站在线视频| 少妇人妻大乳在线视频| 少妇性l交大片| www.夜夜爽| 妞干网视频在线观看| 波多野结衣作品集| 在线观看18视频网站| 116极品美女午夜一级| www.激情小说.com| 免费观看亚洲视频| 88av.com| 女人帮男人橹视频播放| 亚洲国产高清av| 久久亚洲精品无码va白人极品| 亚洲免费看av| av免费观看国产| 久久久福利影院| 久久精品香蕉视频| 久久精品在线免费视频| 欧美伦理视频在线观看| 日韩在线观看a| www.色就是色.com| 播放灌醉水嫩大学生国内精品| 在线观看中文av| 国产一区亚洲二区三区| 国产肉体ⅹxxx137大胆| 超碰成人在线播放| 欧美牲交a欧美牲交aⅴ免费真| 热久久最新地址| 国产三级精品三级在线|